Extreme cost growth : themes from six U.S. Air Force major defense acquisition programs / Mark A. Lorell, Robert S. Leonard, Abby Doll.
- Title
- Extreme cost growth : themes from six U.S. Air Force major defense acquisition programs / Mark A. Lorell, Robert S. Leonard, Abby Doll.
- Published by
- Santa Monica, Calif. : Rand Corporation, [2015]
- ©2015
- Author
Items in the library and off-site
Displaying 1 item
Status | Format | Access | Call number | Item location |
---|---|---|---|---|
Status | FormatBook/Text | AccessUse in library | Call numberUG633.2 .L67 2015 | Item locationOff-site |
Details
- Additional authors
- Description
- xxi, 48 pages : color illustrations; 28 cm.
- Summary
- This report identifies and characterizes conditions present in six U.S. Air Force Major Defense Acquisition Programs (MDAPs) experiencing extreme cost growth, using case study analysis. This report is a companion to Air Force Major Defense Acquisition Program Cost Growth Is Driven by Three Space Programs and the F-35: Fiscal Year 2013 President's Budget Selected Acquisition Reports (RR-477-AF, 2014), which analyzed cost growth trends in current U.S. Air Force MDAPs using Selected Acquisition Report (SAR) data. The case study analysis provided in this document is based on government program documentation and publically available open source materials, as well as interviews with program officials and subject matter experts. The authors find that the key common attributes among the six programs with extreme cost growth can be grouped into two broad areas: (1) premature approval of Milestone B and (2) suboptimal acquisition strategies and program structure. They offer two broad recommendations for improving cost and schedule outcomes for Air Force MDAPs: (1) Establish credible baseline cost estimates at MS B to provide realistic baseline metrics for accurately measuring real cost growth, and (2) develop, refine, and implement robust evolutionary or incremental acquisition strategies and policies that reduce and control technological and programmatic risk, unless timely operational need has clear priority over cost savings.
- Series statement
- Research report
- Uniform title
- Research report (Rand Corporation)
- Subject
- Owning institution
- Harvard Library
- Note
- "RAND Project Air Force"
- "Prepared for the United States Air Force."
- "RR-630-AF"--Cover page 4.
- Bibliography (note)
- Includes bibliographical references (pages 45-48).
- Processing action (note)
- committed to retain